

Commercial EV charging infrastructure engineered for scale
97%
telemetry-monitored uptime SLA
45 Days
average AHJ permit turnaround
350 kW
continuous DC output per port
End-to-end grid deployment
From medium-voltage utility tie-ins to continuous telemetry management, our engineering teams oversee every stage of capital electrification.
480V Interconnect Trenching
High-Output DCFC Dispensers
NEVI Program Administration
Dedicated medium-voltage transformers, concrete pad pours, and directional boring engineered to local utility interconnect standards.
Liquid-cooled 150kW to 350kW dual-port dispensers supporting ISO 15118 Plug and Charge protocols across mixed commercial fleets.
Turnkey federal grant compliance documentation, utility rebate capture, and Buy America certification management for all project sites.
Four-stage execution protocol
Grid Feasibility Assessment
AHJ Permitting and Interconnect
Turnkey Civil Construction
Telemetry SLA Activation
On-site electrical load calculation, transformer capacity verification, and preliminary utility service point coordination.
Trenching, conduit routing, switchgear landing, dispenser commissioning, and local inspector sign-off.
Automated OCPP network integration, power-sharing balancing, and 24-hour hardware dispatch monitoring.
Stamped electrical schematics submitted to local jurisdictions and power companies to secure distribution approvals.
Submit your parcel coordinates or depot electrical schematics. Our utility engineers deliver a full capacity report within ten business days.
